P970 SHIP MAINTENANCE FACILITY
Back to Projects

P970 SHIP MAINTENANCE FACILITY

US NAVY BAHRAIN
Bahrain
2024

Project Overview

Complete storage solutions with design and built approach for US Navy P970 Ship Maintenance Facility in Bahrain. Providing robust industrial-grade storage systems for demanding naval maintenance operations.

Project Objectives

  • Design and build complete storage solutions
  • Ensure compliance with US Navy facility standards
  • Maximize storage efficiency for maintenance operations
  • Achieve 100% safety compliance

Challenges & Solutions

Implementing heavy-duty industrial storage systems while maintaining zero safety incidents and meeting naval facility standards.

Results Achieved

300% storage capacity increase
9,000 SQM optimized storage area
0 safety incidents during installation
100% industrial-grade durability

Project Gallery

Project image 1
Project image 2
Project image 3
Project image 4

Project Details

Status
Completed
Duration

6 months

Budget

$1.2M

Scope

Complete Storage Solutions, Design and Built, Industrial Storage Systems

Technologies Used

Heavy-Duty Racking Systems
Industrial Storage Solutions
Safety Compliance Systems

Interested in Similar Project?

Let's discuss how we can help with your automation needs.