Complete storage solutions with design and built approach for US Navy P970 Ship Maintenance Facility in Bahrain. Providing robust industrial-grade storage systems for demanding naval maintenance operations.
Project Objectives
Design and build complete storage solutions
Ensure compliance with US Navy facility standards
Maximize storage efficiency for maintenance operations
Achieve 100% safety compliance
Challenges & Solutions
Implementing heavy-duty industrial storage systems while maintaining zero safety incidents and meeting naval facility standards.
Results Achieved
300% storage capacity increase
9,000 SQM optimized storage area
0 safety incidents during installation
100% industrial-grade durability
Project Gallery
Project Details
Status
Completed
Duration
6 months
Budget
$1.2M
Scope
Complete Storage Solutions, Design and Built, Industrial Storage Systems
Technologies Used
Heavy-Duty Racking Systems
Industrial Storage Solutions
Safety Compliance Systems
Interested in Similar Project?
Let's discuss how we can help with your automation needs.